Field service
- Power turbine and bearing inspection
- Vibration analysis and trim balancing
- Alignment and coupling checks
- Power turbine removal and installation
TURBINE SERVICES / RT62
The RT62 free power turbine turns the energy of the gas generator’s exhaust into shaft power for the pipeline compressor. We inspect and service RT62 power turbines at compressor stations, manage their overhaul and supply parts with documents.
The RT62 is close-coupled to the rear of the RB211 (SGT-A35) gas generator and, according to Siemens Energy, is fitted to all C, G and GT series units. The free power turbine rotor runs in its own bearings and drives the compressor through a coupling.
The power turbine and the gas generator are planned together but assessed separately: their overhaul intervals and wear differ, and the power turbine usually stays in service when the gas generator is exchanged. The manufacturer also offers an upgraded RT62X power turbine for higher efficiency, more output or a longer time between overhauls.
Photos of our work at the repair facility and at the station.
Typical power turbine work between overhauls and at overhaul:
A separate RB211 gas-generator overhaul contract, covering coordination of workshop repairs, parts, transport, testing and return to site.
A separate three-year maintenance contract covering the fleet at 7 Asia Gas Pipeline compressor stations.
With these details we prepare a preliminary workscope, budget and schedule, or a parts quotation.
Send the power turbine serial number, operating hours and vibration trends, and we will propose the workscope and schedule.